Grundfos helps in Cutty Sark restoration project at Greenwich

Grundfos Pumps, booster

The £50 million restoration project at Greenwich of the tea clipper Cutty Sark includes the installation of a Grundfos cold-water booster set and ancillary items to help ensure that there is sufficient water where and when it is needed. This 19th-century ship has three masts and is over 28 m long. The restoration project was interrupted by a serious fire in 2007, but recently opened by the Queen and the Duke of Edinburgh.

For more information on this story, click here: July 2012, 104
Related links:
Related articles:



modbs tv logo

WIN a Bang & Olufsen speaker system – in the MBS subscriber prize draw 2024

Subscribe, or renew your free subscription, to MBS between 1st June and September 30 2024 and you could win a great prize.

Going Underground

ABM has announced a significant contract win with Transport for London (TfL) to provide mechanical and electrical (M&E) services across the London Underground network.