Mikrofill replaces boilers in CHP plant at Bedford Hospital

Mikrofill, boiler, space heating, maintenance, refurbishment

The replacement of existing CHP plant at Bedford Hospital includes boilers supplied by Mikrofill. The three Ethos boilers each have an output of 130 kW and will primarily serve the hospital’s HWS demand. They are configured to provide heat into the main system when hot-water requirements are at a minimum.

These boilers have stainless-steel heat exchanges and operate in cascade so that the total output of 390 kW can be modulated down 13 kW for precise load matching.

The scheme is fully sequenced to ensure that the LTHW boilers serve heating in preference to the existing steam-to-LTHW heat exchanges. This takes load off the central plant and improves overall system efficiency.

For more information on this story, click here: March 2017, 83
Related links:
Related articles:



modbs tv logo

WIN a Bang & Olufsen speaker system – in the MBS subscriber prize draw 2024

Subscribe, or renew your free subscription, to MBS between 1st June and September 30 2024 and you could win a great prize.

Going Underground

ABM has announced a significant contract win with Transport for London (TfL) to provide mechanical and electrical (M&E) services across the London Underground network.